City of Chicago

01-24-0017: Calumet River Bridges

$112.2 million

Exact amount: $112,191,494.00

Calendar year 2026

Our estimate

Rehabilitation of the bridges over the Calumet River at 92nd St (Ewing Ave), 95th St, 100th St, and 106th St This project also gets money from other lines: Reserve Balance (DOT - FHWA - IDOT - CTY - Highway Planning and Construction (20.205)), paid from Federal grants: $743,418; Reserve Balance (IDOT - Highway Planning and Construction), paid from State grants: $435,855; Construction of Buildings and Other Structures (DOT - FHWA - IDOT - CTY - Highway Planning and Construction (20.205)), paid from Federal grants: $51,958,506. These are different pots of money, so nothing is counted twice. The numbers are not the same kind (some are unspent grant budget from the City's grant ledger, some are amounts the regional plan programs for federal fiscal year 2026), so do not add them up as the project's cost. The grant ledger record (project E9293) is for the 106th Street bridge only. The regional plan project 01-24-0017 covers four Calumet River bridges (92nd, 95th, 100th and 106th Streets), so the ledger amount is part of the same bridge program, matched by name.

Explore this flow Search this budget →

Follow the money

Inside this box

Pick a rectangle to see what is inside it. Rectangle area shows positive amounts; the complete list includes reductions and tiny amounts.

Where the positive amounts goEach rectangle’s area is proportional to its amount. Select a region to open its box; the list below includes every amount.
Construction, State Match - Chicago, $86,191,494.00, open this boxConstruction, State Match - Chicago$86.2 millionConstruction Engineering, State Match - Chicago, $26,000,000.00, open this boxConstruction Engineering, State…$26.0 million

On small screens, use the complete linked table below to explore each box.

All items

Percentages of 01-24-0017: Calumet River Bridges
BoxAmount% of this budget
Construction, State Match - Chicago · Our estimate$86,191,494.0076.8%
Construction Engineering, State Match - Chicago · Our estimate$26,000,000.0023.2%

Sources

↑ Up one level