City of Chicago
Construction of Buildings and Other Structures (HUD - CPD - CDBG-DR - Stormwater Infrastructure - Local Sewer Line Construction (14.218))
$221.3 million
Exact amount: $221,342,000.00
Calendar year 2026
Follow the money
Inside this box
Pick a rectangle to see what is inside it. Rectangle area shows positive amounts; the complete list includes reductions and tiny amounts.
On small screens, use the complete linked table below to explore each box.
All items
| Box | Amount | % of this budget |
|---|---|---|
| 104 blocks of new local sewer main (equal share of each block) · Our estimate | $221,341,999.84 | 100.0% |
| Rounding (cents left over from dividing evenly) · Leftover | $0.16 | <0.1% |
Sources
More facts (2)
Open to load additional facts.