City of Chicago
Building/Construction Inspector
$5.6 million
Exact amount: $5,559,552.00
Calendar year 2026
Follow the money
Inside this box
Pick a rectangle to see what is inside it. Rectangle area shows positive amounts; the complete list includes reductions and tiny amounts.
On small screens, use the complete linked table below to explore each box.
All items
| Box | Amount | % of this budget |
|---|---|---|
| 8 positions x $119,052.00 (grade T 16) | $952,416.00 | 17.1% |
| 6 positions x $157,296.00 (grade T 16) | $943,776.00 | 17.0% |
| 6 positions x $143,352.00 (grade T 16) | $860,112.00 | 15.5% |
| 6 positions x $93,468.00 (grade T 16) | $560,808.00 | 10.1% |
| 4 positions x $136,872.00 (grade T 16) | $547,488.00 | 9.8% |
| 4 positions x $124,740.00 (grade T 16) | $498,960.00 | 9.0% |
| 4 positions x $107,460.00 (grade T 16) | $429,840.00 | 7.7% |
| 3 positions x $102,540.00 (grade T 16) | $307,620.00 | 5.5% |
| 2 positions x $97,932.00 (grade T 16) | $195,864.00 | 3.5% |
| 1 positions x $150,180.00 (grade T 16) | $150,180.00 | 2.7% |
| 1 positions x $112,488.00 (grade T 16) | $112,488.00 | 2.0% |
Sources
More facts (1)
Open to load additional facts.