City of Chicago
Building/Construction Inspector
$2.6 million
Exact amount: $2,606,904.00
Calendar year 2026
Follow the money
Inside this box
Pick a rectangle to see what is inside it. Rectangle area shows positive amounts; the complete list includes reductions and tiny amounts.
On small screens, use the complete linked table below to explore each box.
All items
| Box | Amount | % of this budget |
|---|---|---|
| 6 positions x $157,296.00 (grade T 16) | $943,776.00 | 36.2% |
| 3 positions x $124,740.00 (grade T 16) | $374,220.00 | 14.4% |
| 3 positions x $119,052.00 (grade T 16) | $357,156.00 | 13.7% |
| 2 positions x $143,352.00 (grade T 16) | $286,704.00 | 11.0% |
| 2 positions x $93,468.00 (grade T 16) | $186,936.00 | 7.2% |
| 1 positions x $150,180.00 (grade T 16) | $150,180.00 | 5.8% |
| 1 positions x $107,460.00 (grade T 16) | $107,460.00 | 4.1% |
| 1 positions x $102,540.00 (grade T 16) | $102,540.00 | 3.9% |
| 1 positions x $97,932.00 (grade T 16) | $97,932.00 | 3.8% |
Sources
More facts (1)
Open to load additional facts.